Industrial Lining for New Waste Water Bund, with Salt Tank and Pit Area

Industrial Lining for New Waste Water Bund, with Salt Tank and Pit Area

06/03/25
Copied link to clipboard!

Case Study: Industrial Lining for New Waste Water Bund, with Salt Tank and Pit Area

A new cast concrete waste water bund was built to contain 3 waste water tanks, a salt tank, and a 3m deep pit.

Of the bunded areas, the 3m deep pit was completed first, with a water resistant GRP lining.

A GRP lining and epoxy coating system was then applied to floor and walls of the waste water bund, plinth and pit areas.

An additional smaller acid silo bund and chemical loading pit area were also GRP lined.

1. A new cast concrete waste water bund will contain 3 waste water tanks, a salt tank and a 3m deep pit.

Tank bund lining solutions

We offer a high quality bund lining service to produce a simple, long term cost effective solution to your spill containment, protection and corrosion problems.

2. The bunded areas 3m deep pit completed first, with a waste water resistant GRP lining.

Get a FREE site survey today

Our technical surveyors have years of experience within the industry and are experts in fibreglass lining.

A free site survey will provide you with recommendations for the future use of your tank bund spill containment area.

Call our specialist team to discuss your requirements, quote and get a FREE site survey: 01206 798 798.

3. The concrete bund area now ready for fibreglass matting.

4. Completed GRP lining and epoxy coating system to floor and walls of the waste water bund.

5. Completed GRP lining to plinth and pit area.

6. An additional smaller acid silo bund and chemical loading pit area were also fibreglass lined.

7. Completed GRP lining of chemical loading pit, with walls and floor of the acid silo bund.